After-sales Service: | Field Installation, Commissioning and Training |
---|---|
Certification: | CE, GMP, ISO |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Features
Bottle Entering Station
It is a new type chain conveyor,which is used to delivery bottles to dial wheel flling station, with features of low noise and no reverse pollution of clean air.
Filling Station
Reciprocated tracking filling system,with rotary dial wheel high positioning accuracy,each filling head can be adjusted separately.
Capping Station
Optimized CAD design rolling knives angle and rolling head set, with good adaptability to irregular bottles, with easy operation and fast cap collating.
Ultrasonic Washing
It adopts advanced ultrasonic washing, alternating washing, independent multiple nozzle washing with water,etc.
Integrated Machine
Integrate machines (SQGF) makes it available to wash, fill and screw bottle in one machine, reduces investment and production cost.
Compact Structure
Small occupying area,low bottle breakage rate, universal parts, few specification parts, easy to exchange.
Production Procedures
IVEN Syrup filling and capping machine Tech Specs
ABOUT US
1. Where have you exported your equipment?
We've already exported to more than 45+ countries in Aisa, Europe, Middle East, Africa, South America,etc.
2. Can you arrange the visit to your user?
Yes. We can invite you to visit our turnkey projects in Indonesia, Vietnam, Uzbekistan, Tanzania etc.
3. Can you customize the machine according to our requirements?
Yes.
4. Is your equipment in accordance with GMP, FDA, WHO?
Yes, we will design and manufacture the equipment according to the requirement of GMP/FDA/WHO in your country.
5. What is your payment terms?
Generally, TT or irrevocable L/C at sight.
6. How about your after-sales service?
We will reply you within 24 hours by email or phone.
If we have local agent, we will arrange him to your site within 24 hours to assist you to shoot the problem.
7. How about the staff training?
Normally, we will train your staffs during the installation in your site; you are also welcome to send your staff train in our factory.
8. How many coutries have you done the Turnkey Project?
Russia, Nigeria, Tanzania, Ethiopia, Saudi Arabia , Uzbekistan, Tajikistan, Indonesia, Vietnam, Thailand, Myanmar etc.
9. How long will the turnkey project take?
About 1 year from designing the layout to finish installation and commissioning.
10. Which kind of after-sales service you can offer?
Except the regular service, we can also provide you know-how transfer, and dispatch our qualified engineers to help you run the factory up to 6-12 months.
11. What should we prepare for setting up IV plant basically?
Please prepare the land, building construction, water, electricity, etc.
12. What kind of certificate you have?
We have ISO, CE certificate, etc.