After-sales Service: | Field Installation, Commissioning and Training |
---|---|
Automation: | Automation |
Condition: | New |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
IVEN Pharmatech is the pioneer supplier of turnkey plants that provides integrated engineering solution for worldwide pharmaceutical factory such as IV solution, vaccine, oncology etc., in compliance with EU GMP, US FDA cGMP, PICS, and WHO GMP.
We provide the most reasonable project design, the high quality equipment and the customized service to different pharmaceutical and medical factories from A to Z for Non-PVC soft bag IV solution, PP bottle IV solution, Glass vial IV solution, Injectable Vial & Ampoule, Syrup, Tablets & Capsules, Vacuum blood collection tube etc.
In our turnkey offers we usually exclude those items that can be procured locally at reasonable prices by the customer itself (like land, buildings, brick wall parts…).
IVEN besides can provide the Turnkey project also can help client for below work:
- Advanced Know How Transfer for additional Glass bottle IV solutions.
- Post-Start up assistance
- Raw Materials and Consumables
- Black Utilities
Model | Srd1a | Srd2a | Srd3a | Srd4a | Srd6a | Srd12a |
Production capacity (500 ml) | 900 bph | 2000 bph | 2800 bph | 3600 bph | 5000 bph | 8000 bph |
Power source | Ac 380v50 hz | |||||
Power(kw) | 8 | 22 | 26 | 32 | 32 | 60 |
Compressed air pressure |
Dry and oil-free compressed air pressure is≥0.6 mpa,the cleanness is 5 μm.The machine will automatically warn and stop when the pressure is too low | |||||
Compressed air consumption (/min) | 1000 | 2000 | 2500 | 3000 | 4000 | 7000 |
Clean air pressure | The pressure of clean compressed air is≥0.4mpa,the cleanness is 0.22μm | |||||
Clean air consumption (l/min) | 500 | 800 | 900 | 1000 | 1200 | 2000 |
Cooling water pressure | >0.5kgf/cm2(50kpa) | |||||
Cooling water consumption(Vh) | 100 | 300 | 350 | 500 | 400 | 800 |
Nitrogen consumption |
According to the customer's special requirements,can use the nitrogen to protect the machine,the pressure is≥0.6 mpa.The consumption is≤45 I/min | |||||
Running noise | <75 db | |||||
Room requirements | Environmenttemperature:≤26ºC;humidity:45%-65%,max.humidity≤85% | |||||
Overall size(m) | 3.26*2.0* 2.1 | 4.72*2.6* 2.1 | 5.52*2.7* 2.1 | 6.92*2.7* 2.1 | 8.97*2.7* 2.25 | 8.97*4.65 *2.25 |
Weight(ton) | 3 | 4 | 5 | 6 | 8 | 12 |
The standards of good manufacturing practice (cGMP) require special attention to risk assessment and verification procedures: "… it is requirement of good manufacturing identify the activities of validation necessary to demonstrate control critical aspects of particular operations. The significant changes made to installations, equipment and processes, which may affect product quality, should be validated. A procedure for risk assessment should be used to determine the scope and extent of validation." The Validation Master Plan serves to make sure that all equipment, procedures, that may affect the quality or integrity or effectiveness of the product, are validated; it contains the general principles which comply during the validation task, and plans activities to be carried out for this purpose.
√ Basic Engineering √ Detailed Engineering √ Design Qualification √ Inlet Water Pretreatment Plant √ Pharmaceutical Water Systems (Softened, Purified and Distilled Water) √ Pharmaceutical Processing and Solution Preparation Systems √ Pharmaceutical Bottle washing, Filling, Inspecting, Packaging lines √ Clean Rooms √ Epoxy coating of the floors/PVC floor √ HVAC and air treatment plant √ Autoclave √ Pure Steam Generator and PS circuit √ Laboratories of Analysis (Microbiological / Chemical) √ Site Master Plan √ Validation Master Plan √ Installation √ Training √ Start up √ Technical Files & Documentation √ IQ/OQ √ PQ Protocols √ Validation at Site √ Standard Operating Procedures √ Initial Know How Transfer √ GMP preAudit √ Spareparts for years
Till now, we've already provided hundreds sets of pharmaceutical equipment and medical equipment to more than 40 countries. Meanwhile, we helped our customers to built the pharmaceutical and medical plant with turnkey projects in Russia, Uzbekistan, Tajikistan, Indonesia, Thailand, Saudi, Iraq, Nigeria, Uganda etc. All these projects won our customers and their government high comments.
Meanwhile, we helped our customers to built 20+ pharmaceutical and medical turnkey plants in Russia, Uzbekistan, Tajikistan, Indonesia, Thailand, Saudi, Iraq, Nigeria, Uganda, Tanzania, Ethiopia, Myanmar etc, mainly for IV solution, injectable vials and ampoules. All these projects won our customers and their government high comments.
We also exported our IV solution production line to Germany.